Powerplants - Projects

2008-2009 - BPDP, Bangladesh

GTS Developed a 50 MW gas power plant in a remote area in north eastern Bangladesh. Total turnover of the project was under $14 million.

2004-2005 - Encana, Ecuador

Refurbished Rolls Royce Avon package for a 12 MW power plant in Tarapoa, Ecuador. GTS provided a complete package support and commissioning. Used turbines were from Mexico and refurbished in USA. All control systems were new. The project was completed in 4 months with a turnover of $5.8 million

1997-2000 - Petrobras, Brazil

Gas turbines generators for offshore platforms. GTS supplied total 18 turbines, 10 compressors, 8 generators (15 MW each) and all control systems. The project was jointly managed between GTS and Cooper Energy. Total turnover of the project was $10.5 million

1995-1997 - 140 MW Costal Power Plant, Quetta, Pakistan

GTS teamed up with Fiat Avio to provide a turnkey EPC contract for Coastal Power Company of Houston to build the 140 MW power plant. The project was completed in 1998. It was the first LM6000 based power plant in India-Pakistan-Bangladesh subcontinent. The total turnover of the project was $140 million.

1992-1995 - Enterprise Company, USA

GTS was awarded to provide 6 gas turbine compressors for the petrochemical plant in Houston area for processing 300 mmscfd of gas. The project was completed within the budget on a turnkey basis. Total turnover of the project was $70 million.

1993-1995 - US Navy Guam Power Plant, USA

GTS, partnered with Fiat Avio, was awarded the turnkey project from US Navy for building a 18 MW power plant in Guam. The project was managed solely by GTS with a turnover of $12.5 million.

1990-1993 - Oasis Pipeline Company/Enron Gas, USA

GTS was awarded a turnkey contract from Enron Pipelines to provide 22 Allison GT based compressor stations. GTS completed the project on time and within the budget with a total turnover of $18 million.

1989-1993 - PDVSA, Maracaibo, Venezuela

GTS, along with Dresser Rand, was awarded by PDVSA to provide 22 GT compressor stations on Lake Maracaibo platforms. Total 40 GT compressors and 10 GT generators were retrofitted by GTS team. Total turnover of the project was $80 million.

Powerplants - Projects